HUDCO Project for Water Supply Distribution Network in the Peripheral Circles of GHMC

HYDERABAD METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD
Water Supply Distribution Network Project for the Peripheral Circles of GHMC
- The Government has accorded administrative sanction for the “Water Supply Distribution Network Project for the Peripheral Circles of Greater Hyderabad Municipal Corporation” at an estimated cost of Rs.1900 crores vide GO.Ms.No.138, MA&UD(UBS) Department dated 21.10.2015
- The Project funding is with Rs.1700 crores HUDCO Loan and Rs.200 crores through State Government budgetary support.
- The project works were taken up in three packages as below.
Package |
Package |
Contract Amount |
Name of Agency |
Package-I |
Construction of RCC Service Reservoirs and Providing Inlet, Outlet & Distribution network in Alwal, Kapra, Uppal&Ramachandrapuram Circles. |
Rs.539.32 crores |
M/s.Larsen& Toubro Ltd, Chennai |
Package-II |
Construction of RCC Service Reservoirs and Providing Inlet, Outlet & Distribution network in Quthubullapur, L.B.Nagar, Gaddiannaram, Rajendranagar Circles |
Rs.532.96 crores |
M/s.NCC Ltd, Hyderabad |
Package-III |
Construction of RCC Service Reservoirs and Providing Inlet,Outlet& Distribution network in Kukatpally, Serilingampally, Patancheru Circles |
Rs.561.32 crores |
M/s.Megha Engineering Infrastructure Ltd, Hyderabad |
- The agreements were concluded during Feb’2016
- The Project period is 24 months.
- Most of the reservoir sites have been taken possession from the GHMC, Collector, R.R.District
- Two reservoir sites at Kowkur& Jonnabanda are yet to be received.
Physical Progress:
Reservoirs:
- The total number of reservoirs to be built – 56 Nos.
- Its storage capacity-279-ML
- Individual reservoir capacity ranging from 1 ML to 22.5 ML.
- 54 reservoir works are grounded. For 2 reservoirs i.e,. at Kowkur& Jonnabanda, land yet to be transferred from Collector, R.R.District.
- All grounded reservoir works are in brisk progress.
- It is programmed to complete and commission the reservoir in phased manner.
Pipelines:
- The total length of pipeline to be laid in 2600 Km. The procurement of MS/DI pipelines is in progress.
- Inlet Mains: It is programmed to complete the laying of inlet mains in phased manner.
- Outlet and Distribution mains: It is programmed to complete the laying of outlet & distribution mains in phased manner.
Water Supply Distribution Network Project for the Peripheral Circles of GHMC
PACKAGE -I:
Sl.No. |
|
Reservoir Location |
Capacity |
Reservoir Type |
I |
UPPAL CIRCLE |
|||
1 |
1 |
Elugutta-GLSR |
13.30 |
GLSR |
2 |
2 |
NGRI-ELSR |
1.00 |
ELSR |
3 |
3 |
Chilkanagar- GLSR |
1.00 |
GLSR |
4 |
4 |
Gokhelnagar-ELSR |
1.00 |
ELSR |
II |
KAPRA CIRCLE |
|||
5 |
1 |
Radhika, AS.Rao Nagar- GLSR |
7.00 |
GLSR |
6 |
2 |
Kailasgiri-GLSR |
5.00 |
GLSR |
7 |
3 |
OUT Colony-GLSR |
7.00 |
GLSR |
8 |
4 |
ECIL Zone-GLSR |
7.50 |
GLSR |
9 |
5 |
Snehapuri Zone- GLSR |
6.50 |
GLSR |
10 |
6 |
Gopal Reddy Nagar- GLSR (Vijayapuri Colony) |
2.00 |
GLSR |
III |
ALWAL CIRCLE |
|||
11 |
1 |
Alwal Reservoir I-GLSR |
22.50 |
GLSR |
12 |
2 |
Alwal Reservoir II-ELSR |
2.00 |
ELSR |
13 |
3 |
Yapral-ELSR |
1.50 |
ELSR |
14 |
4 |
Kowkoor- ELSR |
2.00 |
ELSR |
15 |
5 |
Jonnabanda-ELSR (Machha Bollaram(v)) |
1.50 |
ELSR |
16 |
6 |
Jonnabanda-GLSR (Machha Bollaram(v)) |
9.00 |
GLSR |
IV |
RAMACHANDRAPURAM CIRCLE |
|||
17 |
1 |
LIG Quarters (BHEL)-ELSR |
2.50 |
ELSR |
18 |
2 |
MIG Quarters (BHEL)-ELSR |
2.50 |
ELSR |
19 |
3 |
Ashok Nagar-GLSR |
2.50 |
ELSR |
PACKAGE-II:
Sl.No. |
|
Reservoir Location |
Capacity |
Reservoir Type |
V |
QUTHUBULLAPUR CIRCLE |
|||
20 |
1 |
Suraram-GLSR |
7.50 |
GLSR |
21 |
2 |
Chintal-GLSR |
4.00 |
GLSR |
22 |
3 |
Shapoornagar-GLSR |
6.00 |
GLSR |
23 |
4 |
Jagadgirigutta-GLSR |
7.00 |
GLSR |
24 |
5 |
Gajularamaram-GLSR |
2.00 |
GLSR |
25 |
6 |
Alwal-ELSR |
1.00 |
ELSR |
VI |
LB NAGAR, GADDINARRAM & RAJENDRANAGAR |
|||
26 |
1 |
Rythu Bazar-I ELSR |
2.00 |
ELSR |
27 |
2 |
Sahebnagar ELSR |
1.00 |
ELSR |
28 |
3 |
Red Tank, Sachivalayan Nagar- ELSR |
2.00 |
ELSR |
29 |
4 |
White Tank, Prasanthi Nagar-I ELSR |
2.00 |
ELSR |
30 |
5 |
White Tank, Prasanthi Nagar-II ELSR |
1.00 |
ELSR |
31 |
6 |
Green Tank, Vaidehi Nagar-I, ELSR |
2.50 |
ELSR |
32 |
7 |
Green Tank, Vaidehi Nagar-II, ELSR |
1.00 |
ELSR |
33 |
8 |
Auto Nagar- GLSR |
6.00 |
GLSR |
34 |
9 |
Sahebnagar-GLSR |
22.00 |
GLSR |
35 |
10 |
Kothapet, Vasavi Nagar- ELSR |
2.50 |
ELSR |
36 |
11 |
Rocktown, Vasavi Nagar- ELSR |
2.50 |
ELSR |
37 |
12 |
Hayathnagar |
4.00 |
GLSR |
38 |
13 |
Madhubhan, Rajendernagar- GLSR |
9.00 |
GLSR |
PACKAGE-III:
Sl. No. |
|
Reservoir Location |
Capacity |
Reservoir Type |
VII |
SERILINGAMPALLY |
|||
39 |
1 |
HUDA Miyapur-GLSR |
6.00 |
GLSR |
40 |
2 |
Vigyan Vidyalaya (Ayyappa Society)- GLSR |
4.00 |
GLSR |
41 |
3 |
Gopanpally GLSR |
2.50 |
GLSR |
42 |
4 |
Doyens Colony GLSR |
8.00 |
GLSR |
43 |
5 |
Deepthi Sree Nagar GLSR |
4.00 |
GLSR |
44 |
6 |
HCU, Nalagandla-GLSR |
3.00 |
GLSR |
45 |
7 |
IIIT (Sachivalayan Nagar)-GLSR |
2.50 |
GLSR |
46 |
8 |
Lingampally- ELSR |
2.00 |
ELSR |
47 |
9 |
Haffezpet –GLSR |
6.00 |
GLSR |
48 |
10 |
Suraksha Hills |
3.00 |
GLSR |
49 |
11 |
Kondapur (Masid Banda) |
2.00 |
GLSR |
VIII |
KUKATPALLY CIRCLE |
|||
50 |
1 |
Hyderanagar-GLSR |
14.00 |
GLSR |
51 |
2 |
Kukatpally GLSR (Dn-IX Premises for HUDA Park Zone) |
3.50 |
GLSR |
52 |
3 |
KPHB Ph-IV GLSR |
2.50 |
GLSR |
53 |
4 |
Yellammabanda – GLSR |
7.00 |
GLSR |
54 |
5 |
Anjaneya Nagar- ELSR (Kukatpally Mpl Office) 2x2.00 |
4.00 |
ELSR |
55 |
6 |
Shapoornagar-GLSR (IDPL Zone) |
7.75 |
GLSR |
IX |
PATANCHERU CIRCLE |
|||
56 |
1 |
Patancheruvu -GLSR (HMWSSB Premises) |
15.00 |
GLSR |