REVIEW MEETING HELD 29.09.2015

REVIEW MEETING HELD 29.09.2015

Dr.B.Janardhan Reddy, IAS, Managing Director, HMWSSB reviewed the O&M issues including the redressal of complaints at section level, MCC as per Citizen Charter time limits. Complaints about “No Water Supply”, pollution, sewerage overflows should be rectified on the top priority etc., at a meeting held on Tuesday 29th September 2015 at Board Office, Khairatabad.

The Managing Director also reviewed about the various works and instructed the GMs(Engg.) to complete pending works and should also see the work should be completed within a time frame and payment made to the Contractor/Agency.

Among others who were present in the meeting include Sri.M.Satyanarayana, Executive Director, Sri.S.Prabhakar Sharma, Director(Technical), Sri. G.Rameshwar Rao, Director(Operations), Dr.P.S.Suryanarayana, Director(Revenue), Sri.T.Ravinder Reddy, Director(Finance), Sri.P.Ravi, CGM(Engg.), O&M Circle-I, Sri. Azmeera Krishna CGM(Engg.), O&M Circle-II, Sri. A. Prabhakar, CGM(Engg.), O&M Circle-III, Sri.V.L.Praveen Kumar, CGM(Revenue), Sri.B.Vijay Kumar Reddy, CGM(Engg.), Transmission Circle, GMs(Engg.), O&M Wing, HMWSSB.

Feedback