MD'S INSPECTION ON 18.11.2015

    Dr. B.Janardhan Reddy, IAS, Managing Director, HMWSSB inspected the Krishna Drinking Water Supply Project Phase-III balance quantum of 45MGD water that reached Prashashannagar on 18.11.2015. Sri.M.Satyanarayana, Executive Director, Sri. G.Rameshwar Rao, Director (Operations), HMWSSB were present.

Feedback