WATER BULLETIN ON 05.12.2015

1.    First time on an experimental basis, HMWSSB is trying to give water needy areas by reverse pumping Krishna and Godavari water. Hither to these areas were receiving water from Singur and Manjeera rivers. As Singur and Manjeera reservoirs were dried up, these areas were not having water supply. Now 11MGD of water is being diverted in reverse pumping for needy areas as detailed below:

 2.   It is programmed to supply 3.5 MGD of water through Manjeera Phase-I pipeline from Lingampally to BHEL through reverse supply as given below. 

S.No

Offtake

Areas

1

Chandanagar

HUDA Colony, Taranagar, Gandamma Temple, Chandanagar

2

Taranagar

Taranagar(V), Taranagar(M), Pochama Temple

3

Hafeezpet

Youth colony, Sai Colony, Old Hafeezpet

4

Gopinagar

Gopinagar, Adarshnagar-I, II, III & Dubey Colony, Nehru Nagar

5

Vemana colony

Vemana Colony, Reddy Colony, Shanker Nagar, Jawaharcolony:1to6, Vidyanagar, Suraksha Colony, Vemkunta, Bikshapathi Enclave

 3.   It is programmed to supply 6 MGD of water through reverse pumping through Manjeera Phase-II pipeline from Hydernagar -Patancheru line up to Jyothi Talkies near BHEL main entrance. 

S.No

Offtake

Areas

1

PJR Enclave

Aparna, Deepthi Srinagar

2

JP Nagar

JP Nagar, BK Enclave, Prashanth Nagar,                              Sri Rangapuram,

3

Madhav Nagar

Janapriya 5 blocks, Janapriya 16 blocks, Banu Township,  Prajay city, RajaRam colony

4

HUDA Miyapur

Mayurinagar, Buddha Homes, SMR, Divyashakthi,            K Vihar, SB Nagar, Landmark

 4.   It is programmed to supply total quantity of 2.5 MGD of water through reverse pumping through Manjeera Phase-III pipeline from Lingampally to Singapur line up to MIG BHEL as given below. 

S.No

Offtake

Areas

1

BHEL MIG

MIG – 1to 2700

2

HUDA Phase-II

HUDA colony, Chandanagar, Shanthi nagar, Indra nagar, Shivajinagar, Citizen colony

3

Nalagandla (150)

HUDA Trade Centre, Lingampally Village, Brindavan Colony, Gulmoharcolony, Adarshnagar, Bapu Nagar, Nehru Nagar

4

Nalagandla (600)

Nalagandlavillage, Gowlidodi, Thanda, Nanakaramguda, Khajaguda.

 5.   It is programmed to operate 3rd pump on Godvarai project to supply 14 MGD of water within few days, necessary arrangements are being done. 

Feedback