WATER BULLETIN ON 10.12.2015

  1.   Director Revenue and CGM Revenue, had discussions with consultants M/S NCPE Infrastructure India (P) Ltd [consultancy services for conducting detailed survey, investigation and preparation of water supply conceptual design report (CDR) for strengthening, rehabilitation and extension to new areas outside GHMC limits and formulation of water supply system there on for Villages / Grampanchayaths / Habitations following within Outer Ring Road (ORR) including preparation of Detailed Project Report (DPR) converting designs, drawing, estimates. BoQ etc for horizon years requirement of 2021, 2026 & 2031] and the decisions were to generate contour plan of 5KM X 5KM in the absence of 1Km X 1Km grid.                                The consultants were asked to approach  NRSA also to obtain contour intervel plan along with hillock levels. The consultants were also asked to plan teams of 8 members each to be attached to the projects counterpart team so that the visit of the 164 habitations in 78 Grampanchayaths are completed in next 3days.
  2. HMWSSB has conducted review meeting with Managers/ DGMS and GMs of O&M Divisions XII, XIII, XIV, XV and XVI on revenue related issues and stressed the importance of collecting revenue in this critical times, when water from a cheaper source of Manjeera / Singoor is replaced with costly water of Godavari.         
  3.   The Executive Director, Director Technical and Director Revenue, HMWSSB have had discussions with the engineering staff of O&M Division VIII  and Division XV to overcome the crisis of water supply in O&M Division XV which is Miyapur, Hafeezpet etc where in supplies of Manjeera and Singoor have been curtailed.

 

Feedback