WATER BULLETIN ON 11.12.2015

  1. To mitigate hardship of customers of O & M Div XV, Serilingampally, Twelve additional tankers have been deployed to supply drinking water to following areas on 11-12-2015; Chandanagar, HUDA Colony, Vemkunta, Taranagar, Subhashnagar, Bhikshapathi Enclave, Suraksha Colony, etc. About 50 free tanker trips were provided.

           Further to overcome the water supply problem, the following immediate interventions are proposed to               take up on war footing in the Serilingampally division

           Installation of 30 HP online booster at Hafeezpet on PH-I; Installation of 30 HP online booster near BHEL, Taranagar cross roads on PH-I; Enhancement of off-take from existing 150 to 600 mm for HUDA Ph-I & Chandanagar at  old police station on Ph-I; Enhancement of existing 200 mm dia off-take to 600 mm dia at Hafeezpet on Ph-I;   Enhancement of existing 200 mm dia off-take to 400 mm dia  at Miyapur cross road on ph-II; Enhancement of existing 150 mm dia off-take to 250 mm dia at Deepthisrinagar on Ph-I; Junctioning the existing 600 mm dia pumping main to existing 350 mm dia  on Ph-III; line at Financial district pump house Interconnection between 300 and 150 mm dia main for integration at Nehru Nagar Lingampally on PH-III; Installation of 20 HP booster on Bachupally on Bollaram village 300 mm dia  line; Tanker filling point at Chandanagar connecting with ELSR outlet; Tanker filling point at Mayuri Nagar connecting with ELSR outlet; Interconnection between existing 300 mm dia line from Hydernagar with 400 mm dia off-take at Miyapur cross road on Ph-I.

    The Water problem arise at Sarojini Devi Eye Hospital on 8-12-2015 has been resolved.  There was some short fall felt in hospital because of replacement of valve at Asifnagar filter beds.  Now water is supplied normally and today the residual chlorine was also tested and found satisfactory.

     Executive Director reviewed water supply position and Revenue Collection in      O & M Div VI, VII, IX of O & M Circle-II and instructed the employees to improve Revenue Collection as more power charges to be paid because of additional pumping charges of Godavari Project Scheme.