MD STRESSED FOR SOP'S PREPARATION ON 03.09.2016

Sri.M.Dana Kishore, IAS, Managing Director, HMWSSB at a meeting held on 3rd October 2016 stressed the need for immediate preparation of SOPs(Standard Operating Procedures) for all categories from lowest rung worker to Directors of different wings Operation& Maintenance, Transmission, Projects etc,.

He directed to have brain-storming sessions on 5th & 6th October, 2016 and come out with suitable SOPs.

Sri.M.Satyanarayana, Executive Director, Dr.P.S.Suryanarayana, Director(Technical), Sri.G.Rameshwar Rao, Director(Operations), Sri.M.Yellaswamy, Director(Projects), Sri.Azmeera Krishna, Director(P&A), CGMs(Engg.), GMs(Engg.), HMWSSB attended the meeting.

         

Feedback