JNNURM Projects:

HMWSSB has taken up 11 projects under JnNURM at a cost of Rs.2002 Crores for improvement of water supply & sewerage infrastructure. Out of this, 8 projects are completed & commissioned and the balance 3 projects are nearing completion. The details are as below.

 

i. Water Supply Projects Taken up under JnNURM:

Sl.No.Name of ProjectProject Cost (Rs. In Crores)Remarks
1 Krishna Drinking Water Supply Project Phase-II 606.50 Completed
2 Pipeline Project from Sahebnagar to Prashasan Nagar 94.93 Completed
3 Pipeline Project from L.B.Nagar to Marredpally 81.20 Completed
4 Providing flow & level measures and SCADA System for all reservoirs and bulk supply mains in HMWSSB 9.90 Completed
5 Building Additional Storage Reservoirs on South of Musi – 49.50 ML at 7 locations 33.55 Completed
6 Building Additional Storage Reservoirs on North of Musi – 50.5 ML at 7 locations 29.81 Completed
7 Refurbishments of Existing Feeder System including Distribution network for the ten(10) zones in erstwhile MCH limits of Greater Hyderabad Municipal Corporation. 232.22 Completed
  Total 1088.11  

 

ii. Sewerage Projects Taken up under JnNURM:

Sl.No.Name of ProjectProject Cost (Rs. In Crores)Remarks
1 Rehabilitation and Strengthening of Sewerage System in Old City area on South of Musi -Zone –1 (in catchments S1 to S6, S12 and S14) 148.81 Completed
2. Rehabilitation and Strengthening of Sewerage System in Old City area on South of Musi - Zone – 2 (in catchments S7 to S11, S13 and S15) 251.25 Taken up in 3 packages. Two packages completed, one package nearing completion.
3. Implementation of Sewerage Master Plan in Serilingampally Circle of GHMC 200.38 Taken up in 3 packages. Two packages completed, one package nearing completion. Out of 4 STP works, two works completed & two works are in progress
4. Combined DPR for Improvement of Water Supply Distribution Network & Implementation of Sewerage Master Plan for taking up works in identified priority zones of Rajendranagar Circle 314.26 About 97% of project work is completed.
  Total 914.70  
  Grand Total (i & ii) 2002.81  

The balance works of 3 sewer projects are likely to be completed by June’2015.