HUDCO Project for Water Supply Distribution Network in the Peripheral Circles of GHMC

HYDERABAD METROPOLITAN WATER SUPPLY AND SEWERAGE BOARD

Water Supply Distribution Network Project for the Peripheral Circles of GHMC

  • The Government has accorded administrative sanction for the “Water Supply Distribution Network Project for the Peripheral Circles of Greater Hyderabad Municipal Corporation” at an estimated cost of Rs.1900 crores vide GO.Ms.No.138, MA&UD(UBS) Department dated 21.10.2015
  •  The Project funding is with Rs.1700 crores HUDCO Loan and Rs.200 crores through State Government budgetary support. 
  • The project works were taken up in three packages as below. 

Package

Package

Contract Amount

Name of Agency

Package-I

Construction of RCC Service Reservoirs and Providing Inlet, Outlet & Distribution network in Alwal, Kapra, Uppal&Ramachandrapuram Circles.

Rs.539.32 crores

M/s.Larsen& Toubro Ltd, Chennai

Package-II

Construction of RCC Service Reservoirs and Providing Inlet, Outlet & Distribution network in Quthubullapur, L.B.Nagar, Gaddiannaram, Rajendranagar Circles

Rs.532.96 crores

M/s.NCC Ltd, Hyderabad

Package-III

Construction of RCC Service Reservoirs and Providing Inlet,Outlet& Distribution network in Kukatpally, Serilingampally, Patancheru Circles

Rs.561.32 crores

M/s.Megha Engineering Infrastructure Ltd, Hyderabad

 

  • The agreements were concluded during Feb’2016
  • The Project period is 24 months.
  • Most of the reservoir sites have been taken possession from the GHMC, Collector, R.R.District
  • Two reservoir sites at Kowkur& Jonnabanda are yet to be received.

 Physical Progress:

Reservoirs:

  • The total number of reservoirs to be built – 56 Nos.
  • Its storage capacity-279-ML
  • Individual reservoir capacity ranging from 1 ML to 22.5 ML.
  • 54 reservoir works are grounded.  For 2 reservoirs i.e,. at Kowkur& Jonnabanda, land yet to be transferred from Collector, R.R.District.
  • All grounded reservoir works are in brisk progress.
  • It is programmed to complete and commission the reservoir in phased manner.

 Pipelines:

  • The total length of pipeline to be laid in 2600 Km.  The procurement of MS/DI pipelines is in progress.
  • Inlet Mains: It is programmed to complete the laying of inlet mains in phased manner.
  • Outlet and Distribution mains: It is programmed to complete the laying of outlet & distribution mains in phased manner. 


Water Supply Distribution Network Project for the Peripheral Circles of GHMC

 

PACKAGE -I: 

Sl.No.

 

Reservoir Location

Capacity

Reservoir Type

I

UPPAL CIRCLE  

1

1

Elugutta-GLSR

13.30

GLSR

2

2

NGRI-ELSR

1.00

ELSR

3

3

Chilkanagar- GLSR

1.00

GLSR

4

4

Gokhelnagar-ELSR

1.00

ELSR

II

KAPRA CIRCLE  

5

1

Radhika, AS.Rao Nagar- GLSR

7.00

GLSR

6

2

Kailasgiri-GLSR

5.00

GLSR

7

3

OUT Colony-GLSR

7.00

GLSR

8

4

ECIL Zone-GLSR

7.50

GLSR

9

5

Snehapuri Zone- GLSR

6.50

GLSR

10

6

Gopal Reddy Nagar- GLSR (Vijayapuri Colony)

2.00

GLSR

III

ALWAL CIRCLE  

11

1

Alwal Reservoir I-GLSR

22.50

GLSR

12

2

Alwal Reservoir II-ELSR

2.00

ELSR

13

3

Yapral-ELSR

1.50

ELSR

14

4

Kowkoor- ELSR

2.00

ELSR

15

5

Jonnabanda-ELSR (Machha Bollaram(v))

1.50

ELSR

16

6

Jonnabanda-GLSR (Machha Bollaram(v))

9.00

GLSR

IV

RAMACHANDRAPURAM CIRCLE  

17

1

LIG Quarters (BHEL)-ELSR

2.50

ELSR

18

2

MIG Quarters (BHEL)-ELSR

2.50

ELSR

19

3

Ashok Nagar-GLSR

2.50

ELSR

    


PACKAGE-II: 

Sl.No.

 

Reservoir Location

Capacity

Reservoir Type

V

QUTHUBULLAPUR CIRCLE 

20

1

Suraram-GLSR

7.50

GLSR

21

2

Chintal-GLSR

4.00

GLSR

22

3

Shapoornagar-GLSR

6.00

GLSR

23

4

Jagadgirigutta-GLSR

7.00

GLSR

24

5

Gajularamaram-GLSR

2.00

GLSR

25

6

Alwal-ELSR

1.00

ELSR

VI

LB NAGAR, GADDINARRAM & RAJENDRANAGAR   

26

1

Rythu Bazar-I ELSR

2.00

ELSR

27

2

Sahebnagar ELSR

1.00

ELSR

28

3

Red Tank, Sachivalayan Nagar- ELSR

2.00

ELSR

29

4

White Tank, Prasanthi Nagar-I ELSR

2.00

ELSR

30

5

White Tank, Prasanthi Nagar-II ELSR

1.00

ELSR

31

6

Green Tank, Vaidehi Nagar-I, ELSR

2.50

ELSR

32

7

Green Tank, Vaidehi Nagar-II, ELSR

1.00

ELSR

33

8

Auto Nagar- GLSR

6.00

GLSR

34

9

Sahebnagar-GLSR

22.00

GLSR

35

10

Kothapet, Vasavi Nagar- ELSR

2.50

ELSR

36

11

Rocktown, Vasavi Nagar- ELSR

2.50

ELSR

37

12

Hayathnagar

4.00

GLSR

38

13

Madhubhan, Rajendernagar- GLSR

9.00

GLSR

 


PACKAGE-III: 

Sl.

No.

 

Reservoir Location

Capacity

Reservoir Type

VII

SERILINGAMPALLY

39

1

HUDA Miyapur-GLSR

6.00

GLSR

40

2

Vigyan Vidyalaya (Ayyappa Society)- GLSR

4.00

GLSR

41

3

Gopanpally GLSR

2.50

GLSR

42

4

Doyens Colony GLSR

8.00

GLSR

43

5

Deepthi Sree Nagar GLSR

4.00

GLSR

44

6

HCU, Nalagandla-GLSR

3.00

GLSR

45

7

IIIT (Sachivalayan Nagar)-GLSR

2.50

GLSR

46

8

Lingampally- ELSR

2.00

ELSR

47

9

Haffezpet –GLSR

6.00

GLSR

48

10

Suraksha Hills

3.00

GLSR

49

11

Kondapur (Masid Banda)

2.00

GLSR

VIII

KUKATPALLY CIRCLE

50

1

Hyderanagar-GLSR

14.00

GLSR

51

2

Kukatpally GLSR (Dn-IX Premises for HUDA Park Zone)

3.50

GLSR

52

3

KPHB Ph-IV GLSR

2.50

GLSR

53

4

Yellammabanda – GLSR

7.00

GLSR

54

5

Anjaneya Nagar- ELSR (Kukatpally Mpl Office) 2x2.00

4.00

ELSR

55

6

Shapoornagar-GLSR (IDPL Zone)

7.75

GLSR

IX

PATANCHERU CIRCLE

56

1

Patancheruvu -GLSR (HMWSSB Premises)

15.00

GLSR

 

 

 