EP No. 10/ CGM(E) / TC / T3 / O&M Div.No.XXI/ 2022-23, Dtd:17.05.2022new1.gif

Uploded Date: 17-05-2022 Start Date: 17-05-2022 End Date: 18-05-2022 Office Type: Office-1

Interconnection to 350mm dia DI main with 300mm dia MS pipe on 900mm dia MS Shantha Biotech main line at Kompally for improvement of water supplies to Qutbullapur division ....

Full Details

Laying of 300mm dia DI Water Supply line to provide water to the Telangana State Dairy Development Co-Operative Federation Limitednew1.gif

Uploded Date: 18-02-2022 Start Date: 18-02-2022 End Date: Office Type: Office-1

Laying of 300mm dia DI Water Supply line to provide water to the Telangana State Dairy Development Co-Operative Federation Limited.

Full Details

EP No. 112l2nd ca / C(;M(E) / TC / T3 / O&M Div No Xl/ 2021 -22 , Dtd:27 .01 .2022new1.gif

Uploded Date: 27-01-2022 Start Date: 27-01-2022 End Date: 03-02-2022 Office Type: Office-1

Supply and Detivcry of Activated Powder for Water Treatment plant of Phase-ll 410 MLD at Kodandapur SD.No.l of O&M Div.No.Xl, Sahebnagar. Carbon KDWSP under

Full Details

EP No. 115/ CGM(E) / TC / T3 / O&M Div.No.XI/ 2021-22, Dtd:17.01.2022new1.gif

Uploded Date: 17-01-2022 Start Date: 17-01-2022 End Date: 18-01-2022 Office Type: Office-1

Arresting heavy water supply leakage on 2375mm dia MS pumping main header pipe and providing pump house scour arrangements of KDWSP Phase-III pumping station at Kodandapur under SD.No.I of O&M Div.No.XI, Sahebnagar..

Full Details

EP No. 112/ CGM(E) / TC / T3 / O&M Div.No.XI/ 2021-22, Dtd:06.01.2022new1.gif

Uploded Date: 05-01-2022 Start Date: 06-01-2022 End Date: 13-01-2022 Office Type: Office-1

Supply and Delivery of Activated Carbon Powder for Water Treatment Plant of KDWSP Phase-II 410 MLD at Kodandapur under SD.No.I of O&M Div.No.XI, Sahebnagar..

Full Details

EOI No.02 /CGM(E)/ Revenue Circle/ Smart Metering/2o21- 22, DId:23.12.21new1.gif

Uploded Date: 03-01-2022 Start Date: 03-01-2022 End Date: 10-01-2022 Office Type: Office-1

Expression of interest (EOl) for Manufacture, supply, delivery, installation, activation and commissioning of Smart Meters - Ultrasonic type meters with automatic meter reading

Full Details

EoI.No:02/HMWSSB/Revenue/Smart Metering/2021-22/ Dt:23-12-2021.new1.gif

Uploded Date: 28-12-2021 Start Date: 28-12-2021 End Date: 03-01-2022 Office Type: Office-1

In view of the 20KL free water supply per month scheme announced by the Govt of Telangana, various revenue improvement measures of the Board were explored wherein it was decided

Full Details

EP.No.0 I /CGM(EyPCC-l I/ I 800mm dia to 3000mm Ring Main-Kollur/PkgJ/ 202l -22. dated: 22.|2.202I (3'd call).new1.gif

Uploded Date: 24-12-2021 Start Date: 24-12-2021 End Date: Office Type: Office-1

Manufacturing, supplying, lowering, laying, jointing, testing and commissioning of l800mm dia MS Pipeline with cement mortar inlining and out coating (including cost of Valves and other appurtenances) duly tapping on 1800 mm

Full Details

e’Tender No: EP.112(3 rd call)/ CGM(E)/Rev.Circle /AVTS/2021-22, Date:21-12-2021new1.gif

Uploded Date: 22-12-2021 Start Date: 22-12-2021 End Date: 28-12-2021 Office Type: Office-1

Maintenance of existing AVTS (Automatic Vehicle Tracking System) Application and GPS Vehicle Tracking Unit for Tanker Vehicles including all taxes for a period of 2 years complete as directed by the HMWSSB Officials.

Full Details

e'Tender No: EP.l l2l C6M(E) / Rev.Circle / AW S/ 2021 -22, Date:04- 12-2021

Uploded Date: 06-12-2021 Start Date: 06-12-2021 End Date: 13-12-2021 Office Type: Office-1

Maintenance of existing AVTS (Automatic Vehicle Tracking Synem) Application and CP5 Vehicle Tracking Unit for Tanker Vehicles including all taxes for a period of 2 years complete as direaed by the HMWSSB Officials.

Full Details

EoI.No:01/HMWSSB/Revenue/Meters Calibration/2021-22

Uploded Date: 08-10-2021 Start Date: 08-10-2021 End Date: Office Type: Office-1

The Board, owing to its principal mandate of supplying potable water to the citizens in the twin-cities and beyond, has been catering to consumers numbering in excess of 10 lakhs

Full Details

EP No. 81/ CGM(E) / TC / T3 / O&M Div.No.XXI/ 2021-22, Dtd:27.09.2021.

Uploded Date: 27-09-2021 Start Date: 27-09-2021 End Date: 28-09-2021 Office Type: Office-1

Supply delivery and fixing of 1200 MM dia DI B/F Valve Confined to PN16 in place of damaged 1200 MM dia Sluice Valve at Vayupuri X Roads on 1800/1600 offtake to Defence colony 18 ML

Full Details

Ep-23lDiv-XX/.Jillelaguda/2021-22, Date:23.08.2021

Uploded Date: 28-08-2021 Start Date: 28-08-2021 End Date: Office Type: Office-1

Providing water supply by laying of 3OO/21,O/2O0ll5O/1.00mm dia Dl fccdcr mains for old jillelaguda arca and colonies under lillelaguda scclion, Sub Division'1, O and M Division-xX

Full Details

EP No. 73,74 / CGM(E) / TC / T3 / O&M Div.No.XI / 2021-22, Dtd:12.08.2021

Uploded Date: 12-08-2021 Start Date: 12-08-2021 End Date: 16-08-2021 Office Type: Office-1

Arresting water supply leakage on 300mm dia MS air valve extension pipes existing on 2200mm...(Read More)

Full Details

EP No. 66/ CGM(E) / TC / T3 / O&M Div.No.XI/ 2021-22, Dtd:27.07.2021.

Uploded Date: Start Date: 27-07-2021 End Date: 30-07-2021 Office Type: Office-1

Fixing of 1200mm dia DI Butterfly valve with necessary MS specials..(Read more)

Full Details

EP-No. 05/CGM(E)/STP Circle-II/ pipeline/30MLD Lingumkunta/ SD-III/STP Div-III/ 2021-22, dt:23.07.2021

Uploded Date: 23-07-2021 Start Date: 23-07-2021 End Date: 29-07-2021 Office Type: Office-1

Laying of 600mm dia RCC NP4 class pipe line from S.W.Nala to 900mm dia manhole at road no.1 chandanagar colony, chandanagar for increase of flow to 30MLD STP at lingumkunta under SD-III of STP Div-III.

Full Details

EoI.No:01/HMWSSB/Revenue/RBS/2021-22/Dt:15-O7-2021

Uploded Date: 16-07-2021 Start Date: 16-07-2021 End Date: 22-07-2021 Office Type: Office-1

HMWSSB - Revenue Circle - "Expression of interest (EOl) for Design, development/customization.

Full Details

EP No. 60/ CGM(E) / TC / T3 / O&M Div.No.XXI/ 2021-22, Dtd:15.07.2021

Uploded Date: 15-07-2021 Start Date: 15-07-2021 End Date: 19-07-2021 Office Type: Office-1

Dismantling, overhauling, replacement of the motor bearing housings servicing and reassembling of Horizontal 3000KW, 6.6KV, HT WEG make, Squirrel cage induction motor.no.07, including cost of material, transportation

Full Details

e-Procurement -Tender notification

Uploded Date: 13-07-2021 Start Date: 13-07-2021 End Date: 16-07-2021 Office Type: Office-1

Attending repairs and over hauling to 450mm*450mm CI Filter...read more

Full Details

EP-No. 15/CGM(E)/STP Circle-II/ Desilting/4.50MLD Gopanapally/STP Div-IV/ 2021-22, dt:12.07.2021

Uploded Date: 12-07-2021 Start Date: 12-07-2021 End Date: 17-07-2021 Office Type: Office-1

Desilting of 350mm dia RCC sewer pipelines with rotometic sewer croc integrated to the smart JETVAC Truck sewer cleaning machine in Gopanapally Thanda to get required sewage inflow to 4.50 MLD STP at Gopanapally, Serilingampally

Full Details

EP No. 48/ CGM(E) / TC / T3 / O&M Div.No.XI/ 2021-22, Dtd:30.06.2021

Uploded Date: 02-07-2021 Start Date: 02-07-2021 End Date: 03-07-2021 Office Type: Office-1

Lowering of 600mm dia M.S Inlet and Outlet water supply main pipe lines of 5ML Kailasagiri Old and New reservoirs near Rd.No.5

Full Details

EP-No. 12/CGM(E)/STP -II/ inter connections/23 MLD Attapurdt: 14.06.2021.

Uploded Date: 14-06-2021 Start Date: 14-06-2021 End Date: 17-06-2021 Office Type: Office-1

Proposal for improving inflows to 23MLD STP at Attapur by connecting 600mm/350mm dia NP4 class RCC pipeline Sewage outlet lines at 3 locations of Kanthareddy colony main road along Musi to 1000 mm dia RCC Trunk sewer

Full Details

EP.No 37/ICGME)/TC/T3/O&M Div No x/2021-2022

Uploded Date: 09-06-2021 Start Date: 09-06-2021 End Date: 10-06-2021 Office Type: Office-1

EP.No 37/ICGME)/TC/T3/O&M Div No x/2021-2022

Full Details

Eol.No.0 I /HMWSSB/CGM(EyPCC-ll/ Various W/S & Sewerage works I TPQC&QA lBoll2}2l -22, dt: 3 | .05.2021

Uploded Date: 01-06-2021 Start Date: 01-06-2021 End Date: 07-06-2021 Office Type: Office-1

Empanelment of Agencies for providing Third Party Quality Control & Quality Assurance services for various Water supply & Sewerage Works under Project Construction Circle-Il.

Full Details

EP-No. 11/CGM(E)/STP Circle-II/ 600mm/RCCNP4/TATA Motors/30MLD Lingamkunta/STP Div-III/ 2021- 22, dt:09.04.2021

Uploded Date: 12-04-2021 Start Date: 15-04-2021 End Date: 19-04-2021 Office Type: Office-1

Laying of 600mm dia RCC NP4 class pipeline from S.W.Nala to 900mm dia manhole at TATA motors – Chandanagar main road for increase of flow to 30 MLD STP at Lingamkunta under STP Division-III

Full Details

EP-O I Call)/CCM (EyPCC-I/ FSTP-Retaining wall/lnjapur/ 2021-22, dated: Ol .04.2021

Uploded Date: 06-04-2021 Start Date: 06-04-2021 End Date: Office Type: Office-1

EP-O I Call)/CCM (EyPCC-I/ FSTP-Retaining wall/lnjapur/ 2021-22, dated: Ol .04.2021

Full Details

EP.No: 13/CGM(E)/rcC-UWater supply to Qadri Colony in LB Nagar Circle/ 2020-21, dated: 25.02.202t(2nd call)

Uploded Date: 06-04-2021 Start Date: 06-04-2021 End Date: Office Type: Office-1

EP.No: 13/CGM(E)/rcC-UWater supply to Qadri Colony in LB Nagar Circle/ 2020-21, dated: 25.02.202t(2nd call)

Full Details

Corrigendum

Uploded Date: 23-03-2021 Start Date: 23-03-2021 End Date: Office Type: Office-1

Supply and fixing of Ultrasonic water meters with automatic meter reading using LoraWAN technology for 20mm size to non-working, unmetered and repaired Non-Domestic connections under HMWSSB jurisdiction - Corrigendum-l- issued - Reg

Full Details

Construction of Intake Well and Pumping Station at Sunkishala

Uploded Date: 23-03-2021 Start Date: 26-03-2021 End Date: 12-04-2021 Office Type: Office-1

Construction of Intake Well and Pumping Station at Sunkishala including Electro-mechanical equipment .....Read More

Full Details

Laying of 350/300mm dia DI water Supply line for providing water connection to U.S. Consulate General at Sy No.115, opposite BSE Data centre, Gachibowli under Gachibowli Section, SD-I, O&M Div. XV vide File No.2019-1-2502.

Uploded Date: 15-03-2021 Start Date: 15-03-2021 End Date: 23-03-2021 Office Type: Office-1

Laying of 350/300mm dia DI water Supply line for providing water connection to U.S. Consulate General at Sy No.115, opposite BSE Data centre, Gachibowli under Gachibowli Section, SD-I, O&M Div. XV vide File No.2019-1-2502.

Full Details

Laying of 200/150mm dia pipe line for providing water supply to poojitha Enclave Welfare Association, Bachupally section, Sub Divisionll,O&M Division-XXIX/PD.Vll.

Uploded Date: 26-02-2021 Start Date: 26-02-2021 End Date: 05-03-2021 Office Type: Office-1

Laying of 200/150mm dia pipe line for providing water supply to poojitha Enclave Welfare Association, Bachupally section, Sub Divisionll,O&M Division-XXIX/PD.Vll.

Full Details

Laying of 200/150 mm dia water supply line for providing to water supply to Dollar hills under Manikonda Section, Sub Division-|, O&M Division-XVlll

Uploded Date: 23-02-2021 Start Date: 23-02-2021 End Date: 01-03-2021 Office Type: Office-1

Laying of 200/150 mm dia water supply line for providing to water supply to Dollar hills under Manikonda Section, Sub Division-|, O&M Division-XVlll

Full Details

Expression of interest for manufacture, supply, delivery and commisiong of smar meter(ultrasonic) using LORA Wan technology

Uploded Date: 01-02-2021 Start Date: 01-02-2021 End Date: 05-02-2021 Office Type: Office-1

In view of the 20KL free water supply per month scheme announced by the Govt of Telangana, various revenue improvement measures of the Board were explored wherein it was decided to take up fixing of AMR- ultrasonic Meters with LoRaWAN technology.

Full Details

EoI.No:03/HMWSSB/Revenue/MeteringAgencies/Empanellment/2020-21/ Dt:12-01-2021

Uploded Date: 12-01-2021 Start Date: 12-01-2021 End Date: 20-01-2021 Office Type: Office-1

EoI.No:03/HMWSSB/Revenue/MeteringAgencies/Empanellment/2020-21/ Dt:12-01-2021

Full Details

Manning operation and maintenance (MOM) of 30MLD Capaclty Sewerage Treatment Plant (SfP) Lingamkunta, BHEL, Serilingampally for a period of 36 months

Uploded Date: 09-01-2021 Start Date: 11-01-2021 End Date: 25-01-2021 Office Type: Office-1

EP-No. o3/HMWSSB/CGM (E)/STP Circle-II/ MOMLl n ga m ku nta/2020-21, dti 11.01.2020. Manning operation and maintenance (MOM) of 30MLD Capaclty Sewerage Treatment Plant (SfP) Lingamkunta, BHEL, Serilingampally for a period of 36 months.

Full Details